Quick Guide to extension of time claims (EOT Claims)

20th November, 2019

Preparation of Extension of time claims is usual responsibility of a Quantity surveyor. There are three types (categories) of claims in the construction industry including the EOT claims. They are,

  • Prolongation claims (Extension of time Claims)
  • Acceleration claims
  • Disruption claims
  • Test

In this article, we give you a quick guide about prolongation claims or extension of time claims (EOT claims).

Delays are common in the construction industry. In our previous article, we have categorised and discussed possible reasons for project delays. Always these delays can affect the contractor’s cash flow, mainly time-related costs can be increased along with the extended timeline of the project.